Project Description
The project site was at Mahindra & Mahindra where industrial flooring was to be done. Fork lift movement over the floor of approximate 500kg per wheel load was the purpose. The volume of concrete required was less than 1cum.

Challenges
No direct vehicle access at casting location. Volume requirement was also less.

Housekeeping was the major concern as the plant is in running condition.

Thickness was very low (25mm).


Solution

RMC team visited the site & recommended PrismMini with PP fibers for M30 grade. PP fibre helps to mitigate cracking & since the quantity was less (less than 1cum) PrismMini was recommended